This plug is run and set utilizing the compact hydraulic setting tool. The TPBP is run to depth on the hydraulic setting tool and work string. The work string is filled and pressured up to initiate a set. It is a best practice to hold hydraulic pressure and pull tension into the bridge plug, and repeat. Once the element is packed off, right hand rotation will release the setting tool from the bridge plug.