Cemented Ball Drop Systems

Showing all 7 results

  • HydroStim Toe Initiation Valve

    Steelhaus’ HydroStim™ Toe Initiation Valve is designed to provide an economic means to initiate communication with the reservoir.
    Read more
  • Guillotine Floatation Device

    Steelhaus’ Debris-less Casing Floatation Device is a market first, reliable, low risk tool for floating the liner to depth in long lateral completions.Read more
  • Juggernaut Cemented Rotatable Liner Hanger

    Steelhaus’ JUGGERNAUT Cementable Rotatable Liner Top Packer is a heavy duty, reliable and cost-effective liner-top packer hanger.Read more
  • Atomic Toe Initiation Port

    The cyclone toe initiation port is designed to provide an economic means to initiate communication with the reservoir.Read more
  • Cyclone II Toe Initiation Port

    Cyclone II performs multiple pressure tests on the completion string and initiates communication with the reservoir prior to stimulation.Read more
  • DropShift Re-closable ball drop frac system

    The re-closable DropShift System maximizes production and recovery by ensuring every interval is stimulated and allows zonal shutoff after fracturing.
    Read more
  • Dropshift Lite

    Cost effective, light weight and reliable, the Drop-Shift Open Only sleeve allows the operator to selectively fracture a wellbore by dropping a ball from surface.Read more