Steelhaus’ JUGGERNAUT Cementable Rotatable Liner Top Packer is a heavy duty, reliable and cost-effective liner-top packer hanger.

Steelhaus’ JUGGERNAUT Cementable Rotatable Liner Top Packer is a heavy duty, reliable and cost-effective liner-top packer hanger. Steelhaus’ Debris-less Casing Floatation Device is a market first, reliable, low risk tool for floating the liner to depth in long lateral completions. The re-closable DropShift System maximizes production and recovery by ensuring every interval is stimulated and allows zonal shutoff after fracturing. Cost effective, light weight and reliable, the Drop-Shift Open Only sleeve allows the operator to selectively fracture a wellbore by dropping a ball from surface. Steelhaus’ HydroStim™ Toe Initiation Valve is designed to provide an economic means to initiate communication with the reservoir. The Cyclone Toe Initiation Port is designed to provide an economic means to initiate communication with the reservoir. Cyclone II performs multiple pressure tests on the completion string and initiates communication with the reservoir prior to stimulation.
JUGGERNAUT
Zephyr
DropShift
Dropshift Open Only
HydroStim
Cyclone
Cyclone II
Steelhaus’ JUGGERNAUT Cementable Rotatable Liner Top Packer is a heavy duty, reliable and cost-effective liner-top packer hanger. Steelhaus’ Debris-less Casing Floatation Device is a market first, reliable, low risk tool for floating the liner to depth in long lateral completions. The re-closable DropShift System maximizes production and recovery by ensuring every interval is stimulated and allows zonal shutoff after fracturing. Cost effective, light weight and reliable, the Drop-Shift Open Only sleeve allows the operator to selectively fracture a wellbore by dropping a ball from surface. Steelhaus’ HydroStim™ Toe Initiation Valve is designed to provide an economic means to initiate communication with the reservoir. The Cyclone Toe Initiation Port is designed to provide an economic means to initiate communication with the reservoir. Cyclone II performs multiple pressure tests on the completion string and initiates communication with the reservoir prior to stimulation.
JUGGERNAUT
Zephyr
DropShift
Dropshift Open Only
HydroStim
Cyclone
Cyclone II
Steelhaus’ JUGGERNAUT Cementable Rotatable Liner Top Packer is a heavy duty, reliable and cost-effective liner-top packer hanger. Steelhaus’ Debris-less Casing Floatation Device is a market first, reliable, low risk tool for floating the liner to depth in long lateral completions. The re-closable DropShift System maximizes production and recovery by ensuring every interval is stimulated and allows zonal shutoff after fracturing. Cost effective, light weight and reliable, the Drop-Shift Open Only sleeve allows the operator to selectively fracture a wellbore by dropping a ball from surface. Steelhaus’ HydroStim™ Toe Initiation Valve is designed to provide an economic means to initiate communication with the reservoir. The Cyclone Toe Initiation Port is designed to provide an economic means to initiate communication with the reservoir. Cyclone II performs multiple pressure tests on the completion string and initiates communication with the reservoir prior to stimulation.
JUGGERNAUT
Zephyr
DropShift
Dropshift Open Only
HydroStim
Cyclone
Cyclone II
The DropShift System was designed to work with our industry leading Harrier shifting tool and Eco-X packer. After mill out, the Harrier is used for unlimited opening and closing of each sleeve in the event of water encroachment or other wellbore issues, greatly increasing the life cycle of the well while providing complete profile control. The Eco-X packer provides reliable isolation in a tool small in size but big in performance.
The DropShift System maximizes production and recovery by ensuring every interval is stimulated. Re-closable frac sleeves allow zonal shutoff after fracturing for complete profile control of water-producing zones, re-stimulation and other re-work.
With its short length, the DropShift is lightweight and easy to handle. Large ports maximize stimulation rates while proprietary alloys ensure ball seats are easily milled out. The DropShift sleeve is available in P110, L80 and other materials with API, Premium or Semi-Premium Threading.
Steelhaus’ Debris-less Casing Floatation Device is a market first, reliable, low risk tool for floating the liner to depth in long lateral completions.
We have tested thousands of materials to understand how dissolvable materials perform in the wellbore environment. We have used these learnings to optimize the design and materials of each ReacXion plug.
ReacXion Complete was designed to solve the universal problem of dissolvable plugs not dissolving in the wellbore environment.
The ReacXion Slim Extended Range Dissolvable frac plug allows the plug to fit through tight restrictions without compromising pressure or temperature integrity
Steelhaus’ HydroStim™ Toe Initiation Valve is designed to provide an economic means to initiate communication with the reservoir.
The Cyclone Toe Initiation Port is designed to provide an economic means to initiate communication with the reservoir.
Cyclone II performs multiple pressure tests on the completion string and initiates communication with the reservoir prior to stimulation.
Steelhaus’ Debris-less Casing Floatation Device is a market first, reliable, low risk tool for floating the liner to depth in long lateral completions.
FracXion Micro is designed for milling out with minimum torque, generating small cuttings that are easily circulated out of the well.
FracXion Unity fully composite frac streamlines multistage hydraulic fracturing operations while delivering unmatched reliability.
Isolate zones during multistage plug-and-perf fracture stimulation using the Copperhead drillable bridge and frac plug.
Steelhaus’ HydroStim™ Toe Initiation Valve is designed to provide an economic means to initiate communication with the reservoir.
The Cyclone Toe Initiation Port is designed to provide an economic means to initiate communication with the reservoir.
Cyclone II performs multiple pressure tests on the completion string and initiates communication with the reservoir prior to stimulation.
Steelhaus’ Debris-less Casing Floatation Device is a market first, reliable, low risk tool for floating the liner to depth in long lateral completions.
Steelhaus’ Debris-less Casing Floatation Device is a market first, reliable, low risk tool for floating the liner to depth in long lateral completions.
Steelhaus’ JUGGERNAUT Cementable Rotatable Liner Top Packer is a heavy duty, reliable and cost-effective liner-top packer hanger.
The Eco-X Hydraulic Liner Top Hanger creates a ‘rock solid’ bond to the liner with extreme resistance to compression and high tensile loads.
The P3T Tool is designed to reliably measure push, pull, pressure and temperature during annular FRAC operations.
One BHA does it all. The Precision BHA is the most reliable on the market today. Purpose built for the Precision System, the BHA has a field proven track record of engaging, shifting and isolating each zone in the harshest of well conditions.
The CoilShift Precision System is field proven tens of thousands of stages. It is simply the most reliable frac system available today.
The Precision Tracer Integration is designed for high rate while monitoring the reservoir with the help of the tracers.
Designed to allow operators to perform selective single-point multistage fractures, the DTS/DAS provides real time data feedback.
The Eco-X is a light weight full bore open hole packer deployed as part of multi-stage stimulation with no need for pup joints or lifting subs.
The UltraFlow circulation valve is used for selectively shutting off circulation and allowing pressurization of the work string to engage hydraulically set packers along the lateral.
Steelhaus’ HydroStim™ Toe Initiation Valve is designed to provide an economic means to initiate communication with the reservoir.
The Cyclone Toe Initiation Port is designed to provide an economic means to initiate communication with the reservoir.
Cyclone II performs multiple pressure tests on the completion string and initiates communication with the reservoir prior to stimulation.
Steelhaus’ Debris-less Casing Floatation Device is a market first, reliable, low risk tool for floating the liner to depth in long lateral completions.
The Eco-X Hydraulic Liner Top Hanger creates a ‘rock solid’ bond to the liner with extreme resistance to compression and high tensile loads.
The re-closable DropShift System maximizes production and recovery by ensuring every interval is stimulated and allows zonal shutoff after fracturing.
Cost effective, light weight and reliable, the Drop-Shift Open Only sleeve allows the operator to selectively fracture a wellbore by dropping a ball from surface.
The Eco-X is a light weight full bore open hole packer deployed as part of multi-stage stimulation with no need for pup joints or lifting subs.
Steelhaus’ HydroStim™ Toe Initiation Valve is designed to provide an economic means to initiate communication with the reservoir.
The Cyclone Toe Initiation Port is designed to provide an economic means to initiate communication with the reservoir.
Cyclone II performs multiple pressure tests on the completion string and initiates communication with the reservoir prior to stimulation.
The UltraFlow circulation valve is used for selectively shutting off circulation and allowing pressurization of the work string to engage hydraulically set packers along the lateral.
Steelhaus’ JUGGERNAUT Cementable Rotatable Liner Top Packer is a heavy duty, reliable and cost-effective liner-top packer hanger.
Steelhaus’ Debris-less Casing Floatation Device is a market first, reliable, low risk tool for floating the liner to depth in long lateral completions.
The re-closable DropShift System maximizes production and recovery by ensuring every interval is stimulated and allows zonal shutoff after fracturing.
Cost effective, light weight and reliable, the Drop-Shift Open Only sleeve allows the operator to selectively fracture a wellbore by dropping a ball from surface.
Steelhaus’ HydroStim™ Toe Initiation Valve is designed to provide an economic means to initiate communication with the reservoir.
The Cyclone Toe Initiation Port is designed to provide an economic means to initiate communication with the reservoir.
Cyclone II performs multiple pressure tests on the completion string and initiates communication with the reservoir prior to stimulation.